public land occupation for construction hoarding

Fence off your construction site safely, in full compliance with the rules. Apply for a public land occupation permit for hoarding.

Whenever hoarding is installed on pavements, streets or other public spaces, a municipal permit is mandatory. Even if temporary, any form of fencing that occupies public land must be regularised with a formal application.

We handle the entire process for you: from the site survey to the technical documentation, from submitting the application through to collecting the permit. Our service is designed for companies, administrators and private individuals who want to manage their works in an orderly, safe and compliant way, avoiding penalties and unexpected delays.

Find all the information you need about public land occupation for construction hoarding

When a Land Occupation Permit for Construction Hoarding Is Required

Whenever construction hoarding is installed occupying pavements, streets or other public spaces, a municipal permit is mandatory. Without a permit, you risk penalties, suspension of works and legal consequences.

What the Construction Hoarding Permit Covers

The permit allows hoarding to be installed in compliance with regulations to fence off construction sites, helping to protect passers-by, keep public space well organised and ensure compliance with local rules.

Who This Service Is For

This service is designed for:

  • Construction companies
  • Condominium administrators
  • Private individuals starting building works that require hoarding on public land

What Our Full Service Includes

Our service includes:

  • Technical site survey and assessment of the area
  • Preparation of the documentation required by the municipality
  • Submission of the application
  • Monitoring of the process
  • Collection and delivery of the permit obtained

Documents Required

Generally required documents include:

  • Site plan of the area involved
  • Photos of the current condition of the site
  • ID document of the applicant
  • Municipal form (completed by us)
  • Power of attorney, if applicable

Timeframes and Costs

Average time: 5–15 working days
Costs: vary depending on the area occupied, the duration of the occupation and the relevant municipality. We offer free, tailored quotes.

What Happens Without a Permit

Without authorisation, you risk:

  • Fines of up to €1,000
  • An order to halt the construction site
  • Forced removal of the hoarding
  • Civil and criminal liability in the event of damage

F.A.Q.

public land occupation for construction hoarding

Is a permit required even for temporary hoarding?

Yes, any occupation of public land requires authorisation.

Can the company apply for it directly?

Yes, or we can handle it on your behalf.

How long does it take?

On average 5–15 days, but we can speed things up in the case of documented urgency.

Request a Quote

Do you need to occupy public land and want to know the timeframes, costs and required documents?

Fill out the form with the key details: we will get back to you shortly with a personalised, clear, no-obligation quote.

Every request is carefully assessed to give you an accurate and transparent estimate, based on the type of occupation and the applicable municipal regulations.