When a Temporary Driveway Access Permit for a Construction Site Is Required
Whenever a temporary access point needs to be created from private property onto a public road for construction vehicles to enter and exit, a temporary driveway access permit authorised by the municipality is mandatory.
What the Temporary Driveway Access Permit Covers
It regularises temporary access to the construction site from public land, ensuring road safety, compliance with municipal regulations and preventing penalties or disputes.
Who This Service Is For
This service is designed for:
- Construction companies working on sites with access from the street
- Private individuals starting building works who need access for heavy vehicles
- Site managers and technicians responsible for running the construction site
What Our Full Service Includes
We take care of:
- Site survey and assessment of the requested access
- Completion of the application and preparation of documents
- Submission of the request to the municipality
- Monitoring of the process through to the issuing of the permit
Documents Required
Documents generally required
- Site plan showing the driveway
- Description of the works and duration of the construction site
- ID document of the applicant
- Photos of the current condition of the site
- Municipal form (we complete this for you)
Timeframes and Costs
Average time: 5–10 working days
Costs: depend on the municipality, the width of the access and how long it’s used for. We offer free, tailored quotes.
What Happens Without a Permit
Without authorisation, you risk:
- Fines from the local police
- An order to close the access point
- Damage to pavements or the roadway not covered by insurance